Gorgon LNG Project

Client - Areva T&D Australia Limited

End-User - Chevron Australia

Year of Completion - 2012

HVAC Systems

DESMO has successfully bid for the provision of HVAC systems serving the substation buildings required for the Chevron development of the Gorgon natural gas field.

The Gorgon project is one of the world's largest natural gas projects and the largest single resource natural gas project in Australia's history.

DESMO has been commissioned to provide the design, supply, installation and commissioning of 35 climate control & building pressurization systems.  The substations will be prefabricated in Newcastle and Brisbane, and shipped in a completed state to Barrow Island, Western Australia.

Major equipment supplied includes:
Air-Coolded Indoor PAC Unit 70 (70-90 kW)
Air-Cooled Outdoor Condenser Unit 70 (70-90 kW)
Fresh Air Fans 70
Gas Dampers 70
Volume Control Dampers 105
Shut-Off Dampers 70
Pressure Relief Dampers 35
Grilles / Diffusers 350
HVAC Control Panel 35
Instruments 35 lots
Filters 140
Ductwork and Insulation 35 lots
Refrigeration Pipework Systems 35 lots
Electrical and Controls 35 lots

Gorgon LNG Project - Direct Engineering Marine and Offshore - HVAC and air conditioning